Descripción

the project involves changing the location of the bathroom and the expansion of the living area to the detriment of the corridor, there was added a second bathroom for drainage problems to test the new walls are plasterboard.the design decision to change the flooring comes from the idea of unifying all the floors but in the case of budget too high this entry can be deleted and intervene promptly on smaller areas. repainted the walls are decorated with graphic murals in enamel paint.