Descrizione

The main idea of the project was to acquire maximum mobility into the terrain thus providing a circular around all spaces traffic route doubbled both pedestrian, cycling oriented and car - oriented. The main parking aimed to be as green as possible becase it is the entrance card of the building. This parking is supplied with another one in the back of the terrain. If the additional terrain can be authorised then it would benefit from two separate entrances, if not, it is autosuuficient as it is proposed. The parking has a capacity of rough 195 spaces. The design includes a beach bar, a zen garden, a rainforest with rainshowers, a fitness area on 2 levels with dancing/ yoga rooms, a rough 1000 seats capacity football field, 4 paddle courts and a kids play area doubled with a kitchen that can serve some different additional events.