img
4°

Clinica dental - My clinique

siracusa

Commerciale - Co-Working

mehran azharianfar

  • architect
  • Hope Valley, Australia
Descrizione Progetto

After reviewing three proposed floor plans and conducting a technical analysis of the spaces, the version that offered the most functional and geometric efficiency was selected. Modifications were then made to improve practicality and ensure compatibility with the specific needs of a dental clinic, while adhering to technical and construction standards.

✅ Key Modifications Implemented:

Relocation of the CT Scan Room (TAC):
Due to the actual dimensions of the CBCT device with a Cephalometric arm and the requirement for positioning a monitor and control desk, it became clear that the original location was not suitable. Therefore:

The CT scan room was swapped with the Restoration Room (Ritocco).

It is now located closer to the treatment area, improving workflow and patient accessibility.

Adjustment of the Sterilization Room Position:
Because of a window on the current wall, and to optimize natural light and ventilation:

The sterilization room was slightly repositioned.

A more logical connection with the treatment rooms was maintained.

Functional Separation of Two Main Zones (Treatment and Public):
While maintaining the overall structure of the plan:

The treatment and public zones were clearly separated.

Patient and staff circulation routes no longer interfere.

The layout now offers a more organized experience, both functionally and for patient comfort.

🎯 Result:
The revised plan maintains the original coherence but now responds more precisely to the spatial, technical, and operational needs of the clinic. It serves as a solid foundation for the execution phase of the project.

Summary of Plan Refinements After Selecting the Optimal Option from the Three Proposals:

CT Scan Room (TAC) Relocation:
Due to unsuitable dimensions, the TAC room was exchanged with the Restoration Room (Ritocco) and moved closer to the treatment section.

Sterilization Room Adjustment:
Repositioned to better utilize windows and natural light while maintaining access to treatment units.

Functional Space Separation:
Treatment and public areas were clearly divided to ensure workflow, patient privacy, and staff performance are not compromised.

✅ These changes have made the layout more practical and better prepared for the implementation phase.

Leggi di Più