Description

The project will offer apartments accessible only by stairwells, do not plan on balcony system via the internal courtyard balcony that would not guarantee the optimal conditions of overlooking privacy of all local to the court itself.
It includes demolition of all internal partitions and the simultaneous strengthening of related taxes often through in IPE steel beams that also perform the function of containment / masking of electric lighting from above horizontal corrugated to service the premises so not effetture burglary on vault reveals.
It is proposed to realize the local bathrooms and kitchens with appropriate new partitions that form of independent boxes, with its floor set at a height of not less than 2.40 meters and not more than the height useful as standard, in order to keep in view the sometimes the premises. The space between the new floors lightweight type (hollow tiles or panels in concrete subfloor with OSB) and existing sometimes identify the compartments designed to operate, as well as a system to accentuate the spatiality of a non-service environments, even as horizontal closets or planters.
They propose different configurations of internal local distributions which identify two room or three-room within the same gross perimeter.
To dispose of the waste from multiple internal bathrooms, the project aims to create new waste stacks, internal, that connect to the new external descendants front court only at the first floor attic, where a 50/60 cm raised floor guarantees the optimum space to handle the gradients from inside to outside. Thus the first plane should have apartments arranged on split levels between day and night areas, optimum opportunity to feature in an original way the various local and then the commercial offer. Another solution would be to build raised floors on all apartments, until you get the minimum internal height of 2.70 m and use the underfloor space to divert the waste on all floors to the new exterior columns. The difference in altitude between the flat landings can be recovered by intervening on existing risers of the stairs and realizing the so-called "handkerchiefs" in correspondence of the current landings, as well as the project proposes for the part of the building served by the scale compartment "B".